Reblading and Dynamic Balancing |
| |
• |
In-house dynamic balancing of jobs (shafts, rotors, impellers) weighing from 25kg to 30 tons is done. |
• |
We have been doing balancing of ID, PA, FD fan shafts & impellers, turbine rotors as well as pump impellers. |
• |
We have also been doing dynamic balancing of jobs up to 3.5 M diameter and 5M length which includes single as well |
|
as two-plane balancing. |
|
| |
| |
|
|
|
| |
|
Axial ID Fan Repair & Dynamic Balancing |
| |
|
|
 |
 |
|
| Dynamic Balancing of 120 MW I.P. Rotor13 MT |
|
|
|
|
|
|
| |
| |
| Thrust Collar Modification : |
• |
Modification of Thrust Collar [Stub Shaft] of Turbine Rotor 62.5 MW. |
• |
Total work, including balancing, was done by NuMAC in a short time. |
• |
Usually Thrust Collars are integral with Turbine Shaft. But, here, the Collar Stub was bolted to Main Shaft and the second Collar was screwed to this Stub. |
• |
To modify, both Collars were made on the Stub Shaft and this was bolted to main Shaft. |
• |
Screwed part was eliminated. |
• |
Jobs done by OEMs failed but NuMAC job is still doing well after 5 years. |
| |
|
|
|
|
|
|